Bored concrete pile installation : problems & solutions (a case study of the world largest bored concrete pile installation) / Md. Fazle Rabbe.
Material type:![Text](/opac-tmpl/lib/famfamfam/BK.png)
- TA780 .R3 2007
Item type | Current library | Collection | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
![]() |
Architecture Seminar Library | Non-fiction | TA780.R3 2007 (Browse shelf(Opens below)) | 1 | Available | 38338 |
Browsing Architecture Seminar Library shelves, Collection: Non-fiction Close shelf browser (Hides shelf browser)
![]() |
![]() |
No cover image available | No cover image available |
![]() |
![]() |
![]() |
||
TA654.6.V55 2009 Fundamental concepts of earthquake engineering / | TA658.U53 1998 Structural design : | TA681.K46 2001 Advanced concrete structures : | TA780.R3 2007 Bored concrete pile installation : | TC401.R34 2012 Water and environmental engineering / | TD940.S26 2013 Environmental sanitation, wastewater treatment and disposal / | TE177.D56 1999 Time-saver standards : |
There are no comments on this title.
Log in to your account to post a comment.