000 | nam a22 a 4500 | ||
---|---|---|---|
999 |
_c7021 _d7021 |
||
001 | BD-DhNSU-7021 | ||
003 | BD-DhNSU | ||
005 | 20190402132944.0 | ||
008 | 190402s1998 ukna|||g |||| 001 0|eng d | ||
010 | _a | ||
020 | _a082134157X | ||
040 |
_aDLC _cDLC _dBD-DhNSU |
||
041 | _aeng | ||
050 | 0 | 0 |
_aTD196 _b.L4L69 1998 |
082 | 0 | 0 |
_a363.7384 _bL897p |
100 | 1 | _aLovei, Magda | |
245 | 0 | 0 |
_aPhasing out lead from gasoline : _bworldwide experiences and policy implications / _cMagda Lovei |
260 |
_aWashington, D.C. : _bThe World Bank, _cc1998. |
||
300 |
_axv, 40 p. : _bill. ; _c28 cm. |
||
490 | 1 | _aWorld Bank technical papers; no.397 | |
650 | 0 | _aLead abatement Lead abatement | |
650 | 0 | _aGovt. policy | |
942 |
_2lcc _cBK |